Project Type: Trend BEMS
Location: Cribbs Causeway, Bristol
Value: £85,000
Completion: September 2020

Contract Period: 14 Weeks
Client: Fuseland Mechanical Services
Consulting Engineer: Silcock Dawson

Builder: Midas

The £12.3 million outlet includes showrooms, a 280-space roof-deck car park, workshops, servicing bays and office space over two floors.

Showrooms and parking areas have capacity for more than 400 vehicles together with workshops and servicing bays accommodated on the 72,000sq-ft site.

The Main Plantroom Trend IQ4E controller and panel is configured to suit the newly installed LTHW, Natural Vent, and AHU Plant.

The Mitsubishi AC Fan Coil Units integrates with the BMS to maximise running efficiency.

– Low Temp Hot Water Heating Plant

– Radiant Panel Heating

– Workshop Gas Plant

– Domestic Hot Water Services

– Air Handling Units

– AC/VRF Integration

– Electricity & Energy Metering Integration

– Lighting Control system

– Natural Ventilation

– Occupancy Sensors, WC Water Solenoid Valves &    VAV Vent Dampers